HOA · AOAO · Condo · Multi-Unit
Painting an occupied community is a coordination job as much as a coating job. We scope the buildings with the board or property manager, then plan the work around residents, parking, and access.
Scope, products, phasing, and schedule are confirmed after an on-site walkthrough of the property.
In every hoa, aoao & condo painting project
One written scope covering buildings, common areas, railings, doors, and trim
Board and property-manager coordination from the site walk through close-out
Approved color schedule documented before any finish coat goes on
Resident notices, parking and access plans, signage, and surface protection
Repairs and prep completed before coating, building by building
Property-manager close-out package with a punch list walk
Prep decides the finish
Request an HOA or condo walkthrough.
Kaneohe based · Licensed CT-39064 · Islandwide Oahu
Process
Site walk
We walk every building and common area, note substrate condition, railing and stair corrosion, stucco cracks, and wood damage, then put the scope in writing.
Plan
We map phases building by building, agree on work hours the property allows, and prepare resident notices, parking plans, and signage with the manager.
Colors
Colors and sheens are documented per element, walls, trim, doors, railings, so the board approves one schedule and the crews work from it.
Protect
Walkways, doors, windows, lanai contents, landscaping, and vehicles are protected before any prep starts in a phase.
Prepare
Detergent wash, scraping, caulking, and scoped stucco, spall, wood, and metal repairs are completed and cured before coating.
Coat
Each phase is coated to the approved schedule and closed out before the next phase opens, so residents deal with one area at a time.
Close-out
We walk the property with the manager, work the punch list, and hand off the documented color schedule and scope record.
System options
Corridors, stairwells, entries, and trim that need a coating refresh rather than a full envelope.
Occupied condo and townhome buildings being repainted phase by phase.
Coastal properties with concrete spalling, railing corrosion, or heavy substrate damage.
HOA, AOAO & Condo Painting FAQ
We break the property into phases, usually building by building or elevation by elevation, and close each phase out before opening the next. Phase order, work hours, and duration are set with the board or manager during planning, not promised in advance.
We prepare notices with the manager covering dates, affected areas, lanai clearing, and parking. Signage goes up before a phase starts, and access needs like gate codes or escort requirements are confirmed with management.
Yes. Colors and sheens are documented per element and approved before any finish coat. If the board is still deciding, we can provide chips or sample areas for review.
Scope, substrate repairs, coating system, phasing, access, and schedule. None of it is set until we have walked the property, because building condition varies far more than square footage suggests.
“I told Kyle right up front that I'm very picky and detail-oriented. He said those are exactly the clients he loves. Meticulous prep, cleaned up daily, and walked the whole job with us. Highly recommend.”
Free estimate